Fall Line
← Writing
Technology · 10 Oct 2026

Was TSMC worth $6.6 billion?

My thoughts on why America paid a Taiwanese company to build chips in Arizona.

By Roman Boschetto
The short version

One company on one island makes almost all of the world's most advanced chips.

America paid that company $6.6 billion to build some of them in Arizona. I think it was worth it, and I think it was cheap.

One company

Taiwan Semiconductor Manufacturing Company, or TSMC, does not design chips. It builds them for the companies that do: Apple, Nvidia, AMD and almost everyone else.

In the second quarter of 2026 it took 72.5% of all the money spent on contract chip-making, a record. The next four companies combined took 18.4%.

Share of contract chip-making revenue, Q2 2026
TSMC72.5% Samsung5.9% SMIC5.4% UMC3.9% GlobalFoundries3.2%

Source: TrendForce. Samsung is Korean, SMIC is Chinese, UMC is Taiwanese and GlobalFoundries is American.

That chart understates it. For the most advanced chips, the ones that run AI models and new phones, a 2021 study by the Semiconductor Industry Association and Boston Consulting Group found that 92% of the world's capacity was in Taiwan. The other 8% was in South Korea. None was in the United States.

Why nobody can replace it

Samsung is the only real rival at the leading edge, and its share is a twelfth of TSMC's. SMIC is China's champion, but it is cut off from the most advanced chip-making machines. GlobalFoundries stopped trying to make leading-edge chips years ago.

Chips are also not something buyers can go without. Demand is inelastic: when the price rises or supply falls, a carmaker cannot swap a chip for something else. We saw this after COVID. Goldman Sachs counted 169 industries hit by the chip shortage, and AlixPartners estimated it cost carmakers $210 billion in revenue in 2021 alone.

That was a shortage of ordinary chips, with every factory still running.

One island

Taiwan sits about 100 miles from mainland China, which claims it. Bloomberg Economics modelled what a war over the island would cost. Its answer was around $10 trillion, about 10% of the world economy, more than the war in Ukraine, COVID or the 2008 financial crisis.

Fall in GDP in the first year of a war over Taiwan
Taiwan40% China16.7% World10.2% United States6.7%

Source: Bloomberg Economics, January 2024. Even a blockade with no war would cut world GDP by 5%. Bloomberg says the range of uncertainty is wide.

A large part of that damage comes from one thing: the chips stop.

What America paid, and what it got

In November 2024 the US government finalized a $6.6 billion grant to TSMC under the CHIPS and Science Act, plus up to $5 billion in loans. I used to think the subsidy was the $100 billion in the headlines. It is not. That is TSMC's own money.

TSMC's planned investment in Arizona
AnnouncedTSMC's commitmentFactories
May 2020$12bn1
Dec 2022$40bn2
Apr 2024$65bn3
Mar 2025$165bn6

The 2025 plan also includes two packaging plants and a research center. The US grant is $6.6bn, or 4% of the total. The March 2025 increase was reported by the Wall Street Journal.

The first factory has been in high-volume production since late 2024, making chips for Apple and AMD. On TSMC's January 2026 earnings call, chief executive C.C. Wei said of Arizona that "even the yield or defect density is almost equal to Taiwan." The second factory is built and is due to start production in the second half of 2027, a year earlier than planned. The third is under construction.

TSMC has said that when the full site is finished, about 30% of its most advanced capacity will be in Arizona. In 2021 that number for the whole United States was zero.

There are spillovers too. A factory like this brings suppliers, trained engineers and research with it, and those benefits reach companies that never paid for them. Economists call that a positive externality, and it is the textbook reason to subsidize something.

Why I think it was cheap

Think of the grant as an insurance premium. America paid $6.6 billion once. The loss it is insuring against is measured in trillions, and the US share alone would be 6.7% of GDP.

The premium also pulled in $25 of private money for every $1 of public money. I cannot think of many government programs with that ratio.

And I think moving production home is smart for a simpler reason. A supply chain that depends on one place will eventually be hit by something: a war, an earthquake, a pandemic. A company or a country that has a second source survives the bad year. One that does not is at the mercy of whoever controls the first.

What would prove me wrong

The cost per job. The Peterson Institute studied the whole CHIPS Act and put the subsidy at $185,000 per job per year. Its authors wrote that "more production might not provide the best security for the money." That money could have gone to schools, hospitals or roads, and it went to a profitable foreign company. If the goal were jobs, this would be a bad deal. I think the goal is security, and I judge it on that.

The best chips are still made in Taiwan. Arizona's first factory makes 4-nanometer chips. TSMC's newest process is 2-nanometer, and Arizona is not due to make those until about 2029. If a crisis came tomorrow, Arizona would not be enough.

It costs more. The same industry study that gave me the 92% figure found that a US factory costs 25% to 50% more to own over time than one in Asia. TSMC's finance chief said overseas factories will cut its profit margin by 2 to 3 points in the next few years, and by 3 to 4 points later.

Insurance only pays if it covers the loss. $6.6 billion does not remove a $10 trillion risk. It reduces one part of it. If Arizona never grows past a small share of TSMC's output, America will have bought a factory, not security.

I would change my mind if the later factories slip by years, if Arizona's share of advanced capacity stays far below 30%, or if its chips turn out too expensive for customers to choose them without being pushed.

Notes

This piece grew out of a commentary I wrote for IB Economics in March 2025. Market shares are from TrendForce. The 92% figure and the cost comparison are from the SIA and BCG study of April 2021. Arizona's timeline is from TSMC's announcements and its fourth-quarter 2025 earnings call. The $25 to $1 ratio is $165bn divided by $6.6bn.

Student research for educational purposes; not investment advice.

Think I have this wrong, or want to talk it through? Email me or find me on LinkedIn.